Calculate generator runtime overage from meter readings
Separate a generator’s booked time from the operating time on its hour meter.
At the rental counter
- Photograph the hour meter at both handoffs and enter its tenths digit.
- Record included hours for the full booking. Apply the per-hour rate only to extra runtime.
- Enter fuel separately based on the recorded fuel condition and the agreement.
Worked example
A generator records 26.3h on a 24.0h allowance. At $18.50 per hour the 2.3h overage comes to $42.55.
Frequently asked questions
Does late time count as generator runtime?
Runtime comes from the meter. Late fees come from the actual return date and time after grace.